KalshiAbierto

How many PJM capacity emergency days will there be in 2026?: Will the number of calendar days on which an RTO-wide PJM Maximum Generation Emergency/Load Management Alert – Capacity Emergency – NERC EEA 1 was applicable in 2026 be above 20 days?

No88 %
Above 20 days12 %

Precio comprobado el

Operar
Define tu país para ver dónde puedes operar.Definir tu país →
Abre la plataforma en una pestaña nueva, a través de Predxy.
Volumen 24 h0 US$
Volumen 7 d—
Volumen 30 d—
Liquidez—
Spread1 %
Se resuelve8 ene 2027dentro de 3 meses

Historial de probabilidades

Arrastra para mover · pellizca o usa ⌘/Ctrl+desplazamiento para ampliar

Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.

Historial de probabilidades0%25%50%75%100%7 sept12 sept18 sept24 sept30 septLos periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.

Basado en los precios de los posibles resultados de este mercado, expresados como probabilidades.

Reglas de resolución

If the the number of calendar days on which an RTO-wide PJM Maximum Generation Emergency/Load Management Alert – Capacity Emergency – NERC EEA 1 was applicable in 2026 is above 20 days, then the market resolves to Yes. A calendar day counts once if the specified emergency procedure was applicable for any portion of that day, regardless of how many separate postings were issued. Only postings applying to PJM-RTO will count; emergencies limited to individual zones or regions will not. Drills will not count. PJM’s Postings Report explicitly counts an event on each date for which it is applicable, including events that span multiple calendar days Clarification (09/02/26): PJM’s Postings Report identifies 11 eligible calendar days on which the specified alert was applicable through September 2. Although 12 non-drill days appear under “postings”, one of those dates, May 20, is excluded because the corresponding alert applied only to BGE, DOM, and PEPCO, rather than PJM-RTO. Drills are also excluded, and each qualifying calendar day is counted only once. Accordingly, the current resolution value is 11 qualifying days, and the “Above 10 days” market will be determined Yes. The other strikes remain undetermined.

Otras variantes de este evento

Actividad en la plataforma

Titulares—
Valor en posiciones—
Operaciones (24 h)—
Operaciones—
Interés abierto—
Comentarios0

Debate en Predxy

Inicia sesión para participar en el debate.

Nadie ha dicho nada aquí todavía.

A las 30 sept, 07:00 UTC