KalshiAbierto

Will the Kennedy Center be demolished in 2026?: Will the Kennedy Center be demolished before Jan 1, 2027?

No95 %
Before Jan 1, 20275 %

Precio comprobado el

Operar
Define tu país para ver dónde puedes operar.Definir tu país →
Abre la plataforma en una pestaña nueva, a través de Predxy.
Volumen 24 h6,3 US$
Volumen 7 d—
Volumen 30 d—
Liquidez—
Spread1 %
Se resuelve1 ene 2027dentro de 3 meses

Historial de probabilidades

Arrastra para mover · pellizca o usa ⌘/Ctrl+desplazamiento para ampliar

Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.

Historial de probabilidades0%25%50%75%100%17 sept21 sept24 sept28 sept1 octLos periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.

Basado en los precios de los posibles resultados de este mercado, expresados como probabilidades.

Reglas de resolución

If a listed news source confirms, after Issuance and before Jan 1, 2027, that the Kennedy Center's main building was fully demolished during that period, then the market resolves to Yes. This must be confirmed, verified, or established as factual by at least one Source Agency. News confirmation is defined as a published article, broadcast segment, or official news report by a Source Agency, that A) explicitly states completed demolition of the Kennedy Center main building occurred, is true, or has been verified, B) based on journalistic investigation, sources, or evidence, and C) presented as factual reporting rather than speculation, rumor, or unverified allegation. Demolition means the above-ground main building, including its structural frame, has been fully torn down. Foundations, subsurface structures, and debris may remain. Interior gutting, partial demolition, removal of building components, or stripping the building to a retained steel frame do not qualify. Plans, announcements, beginning demolition, closure, fencing, and work on the REACH or other campus structures do not qualify.

Actividad en la plataforma

Titulares—
Valor en posiciones—
Operaciones (24 h)—
Operaciones—
Interés abierto—
Comentarios0

Debate en Predxy

Inicia sesión para participar en el debate.

Nadie ha dicho nada aquí todavía.

A las 1 oct, 16:00 UTC