LimitlessAbierto

When will Big Bend border construction resume: Before Nov 1, 2026

No89 %
Yes11 %

Precio comprobado el

Operar
Define tu país para ver dónde puedes operar.Definir tu país →
Abre la plataforma en una pestaña nueva, a través de Predxy.
Volumen 24 h—
Volumen 7 d—
Volumen 30 d—
Liquidez—
Spread—
Se resuelve2 dic 2026dentro de 2 meses

Historial de probabilidades

Arrastra para mover · pellizca o usa ⌘/Ctrl+desplazamiento para ampliar

Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.

Historial de probabilidades0%25%50%75%100%2 sept9 sept16 sept23 sept1 octLos periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.Los periodos sombreados no tienen una comprobación horaria de precios satisfactoria.

Basado en los precios de los posibles resultados de este mercado, expresados como probabilidades.

Reglas de resolución

If physical construction work on federal border security infrastructure inside Big Bend National Park resumes after Issuance and before Nov 1, 2026, then the market resolves to Yes. Only reporting from any of the Source Agencies qualifies for the purposes of this market. Reports that merely reference prior publications (from before Issuance) do not qualify. Republishing of content originally produced by other sources (e.g., wire services) only qualifies if the content is hosted on the outlet's official platform and the outlet is clearly identified as the publishing entity. Only work inside the boundary of Big Bend National Park counts. Activity elsewhere along the border, including elsewhere in the Big Bend Border Patrol sector and on state or private land, is outside this market. Federal border security infrastructure means patrol and access roads, vehicle barriers, fencing or wall, detection technology, surveillance towers, lighting and power lines installed for border security purposes. Work on any one component is enough, and it does not matter how the work is characterised by the agency or its contractors. Qualifying work is physical: disturbing ground, or erecting or installing any of that infrastructure. The following do NOT satisfy the Payout Criterion: Surveying, mapping, environmental review or planning that does not disturb ground Moving or staging equipment without physical work starting Restoration, revegetation or remediation of ground disturbed before the pause An announcement that work will resume on a future date Outcome verified from The New York Times , the Associated Press , Bloomberg News , Reuters , Axios , Politico , Semafor , The Information , The Washington Post , The Wall Street Journal , ABC , CBS , CNN , Fox News , MSNBC , NBC , BBC , The Guardian , ABC News Australia , South China Morning Post , and CBC .

Otras variantes de este evento

MercadoPlataformaPrecioEstado
When will Big Bend border construction resume: Before Dec 1, 2026Limitless85 % NoAbierto
When will Big Bend border construction resume: Before Oct 1, 2026Limitless99 % NoAbierto

Actividad en la plataforma

Titulares0
Valor en posiciones—
Operaciones (24 h)—
Operaciones—
Interés abierto—
Comentarios0

Mejor compra 6 % · mejor venta 17 %

Debate en Predxy

Inicia sesión para participar en el debate.

Nadie ha dicho nada aquí todavía.

A las 1 oct, 02:44 UTC