Will there be a power grid emergency in New England before October 1?
Preț verificat la
Ultima verificare a eșuat. Sunt afișate ultimele prețuri cunoscute.
Istoricul probabilităților
Probabilități implicite ale pieței · Tot istoricul înregistratTrage pentru a muta · ciupește sau ⌘/Ctrl+derulare pentru zoom
Perioadele umbrite nu au o verificare orară reușită a prețurilor.
Pe baza prețurilor rezultatelor posibile ale acestei piețe, exprimate ca probabilități.
Reguli de decizie
This market resolves "Yes" if ISO New England (ISO-NE) — the grid operator for the six New England states of Connecticut, Maine, Massachusetts, New Hampshire, Rhode Island, and Vermont — declares a NERC Energy Emergency Alert at Level 2 (EEA-2) or Level 3 (EEA-3) at any point from this market's creation through 11:59 PM ET on September 30, 2026. A lower EEA-1 declaration does not qualify. A declaration qualifies as long as it happened before the deadline, even if it is only documented or reported afterward. A DOE Section 202(c) emergency order is not a NERC EEA declaration and does not qualify. Because Energy Emergency Alerts are federally reportable, a qualifying declaration is also verifiable through mandatory NERC or U.S. Department of Energy records (DOE Form OE-417, published at https://www.oe.netl.doe.gov/oe417.aspx) even if no other source captures it. The declaration will be confirmed by any official ISO New England communication — its press releases (https://www.iso-ne.com/about/news-media/press-releases), market notices, or real-time system-status postings — or by credible national news reporting. It qualifies as long as the declaration itself happened before the deadline, even if it is only documented or reported afterward. Otherwise, this market resolves "No".
Celelalte variante ale acestui eveniment
O variantă citită singură induce în eroare; celelalte sunt alături.| Piață | Platformă | Preț | Stare |
|---|---|---|---|
| Will there be a power grid emergency in Texas before October 1? | Polymarket | 100 % No | Deschisă |
| Will there be a power grid emergency in the Central US before October 1? | Polymarket | 100 % No | Deschisă |
| Will there be a power grid emergency in California before October 1? | Polymarket | 100 % No | Deschisă |
| Will there be a power grid emergency in New York before October 1? | Polymarket | 99 % No | Deschisă |
Activitatea platformei
Citit de la platformă minutul acestaDiscuție pe Predxy
Ce cred cititorii Predxy despre această piață. Toți pot citi; cititorii autentificați pot scrie. Discuția platformei, dacă există, este în caseta de mai jos.Autentifică-te ca să participi la discuție.
Nimeni nu a spus încă nimic aici.
La 1 oct., 16:00 UTC